More work to the front section. The section where the oil cooler is located needed some modification. One of the oil line was routed in to the trunk and out again through another hole in the battery box. Since I deleted the battery boxes, I modified the section where the oil lines will be located. Here are some pictures.
The large hole at the left was for the upper oil line.
I cut a piece out.
Fitted in a new piece.
Test fitting the oil cooler and lines.
On the suspension pan, I had some overlap from back than when I replaced it. So I cleaned this up and removed the overlapping section.
I found some rust around the cross member mount.
I decided to remove the section to see what's going on.
Here is one of the mounts removed. I got new ones for both sides.
I saw from the inside of the smugglers box some light shining in through some small holes, so I removed the gravel guard of that section.
From the inside there was also some rust and the bottom of the vertical metal was rusted, so I cut out and replaced it with a new piece.
From the outside.
Here all finish welded in.
Next, the bottom section of the smugglers box.
Cutting out some rusty metal until its good material to weld on.
Making a separator piece (or whatever it's called)
Welding in the new outer piece, I also deleted the hole which had a round cover mounted. This just simplifies things.
Finish
Here a view from inside.
To be continued.
Cheers
Engelbert